Wow that is lots of specific information for a closed investigation? Phase to phase short doesn’t go to ground but can produce on hell of an arc, “could have failed”, “product or procedure”, “over current”. This simply adds to the preconceived assumptions that the utility is at fault.
2 Likes
2 Likes
Minimal fire behavior observed. Suppression repair continues on portions of the fire. Type 2 CAIIMT 12 (Aragon) in command. .
2 Likes